Fishing Job for ESP Recovery

Fishing Job ESP Recovery

Impeller of the ESP

Wellsite’s Permian operations team was called out to assist an operator with an ESP which had come apart downhole during a tubing workover operation. The ESP separated into several parts while the workover rig provider was pulling the tubing.

All parts of the ESP were recovered within three quick trips. The operator was pleased with the professionalism, knowledge and end result of Wellsite’s successful efforts.

Contact our experienced team for any downhole recovery needs.

>>Download this Permian Basin case study

Comments are Closed

^
MENU