Permian Basin Experience

 

Permian Basin Activity

  • Light Towers on Location Wellsite Fishing & Rental Services continues to supply operators with long run time, diesel-powered, & LED light towers throughout the Permian, Utica and Marcellus shale regions. Wellsite’s light towers provide superior illumination with high powered LED bulbs, reducing the amount of towers required to properly, safely illuminate well locations and pads. Along with the cost savings ...
  • Fishing Job for Screen Recovery Wellsite’s Permian operations team was called on to assist an operator with the recovery of a downhole screen used for sand control. The screen had come apart during a production tubing retrieval operation, when the screen slid off the main assembly body, causing an obstruction in the well. After several attempts to retrieve the screen, the ...
  • Fishing Job for Packer Recovery Wellsite’s Permian operations team was requested to assist a Permian operator with retrieving a stuck packer. After several failed attempts by the onsite team, the operator contacted Wellsite’s experienced team to obtain advice. After reviewing, Wellsite’s Permian operations team was asked to arrive on location as soon as possible. Upon arrival, Wellsite’s fishing supervisor received all ...
  • Fishing Job for ESP Recovery Wellsite’s Permian operations team was called out to assist an operator with an ESP which had come apart downhole during a tubing workover operation. The ESP separated into several parts while the workover rig provider was pulling the tubing. All parts of the ESP were recovered within three quick trips. The operator was pleased with the ...
  • Fishing Job for ESP Cable Recovery Wellsite’s Permian operations team was called out to assist an operator with an ESP cable that had broken off of an ESP assembly during a tubing workover operation. The ESP cable separated from the tubing and the ESP assembly while the workover rig was pulling the tubing. The cable crimped and winded up, causing a ...
  • Reverse/Fishing Operation Wellsite was requested to assist an operator with a fishing job consisting of parted tubing. Two of Wellsite’s reverse unit/fishing operators were mobilized, along with one of several high performing JWS340 pumps, a tank and a 2.5 power swivel. In addition to the parted tubing in the well, the ESP pump was also down hole. ...
  • Parted Tubing with Rods Inside The Wellsite Fishing & Rental Services’ Permian team recently arrived on location to tubing that parted at a pin screwed into the wellhead. To make matters worse, the rods and downhole pump were still in the well. The Wellsite operator began fishing out the rods inside the tubing, securing 13-90 joints per trip. In an attempt ...
  • ESP Gas Separator Recovery A diamond burning shoe and wash pipe extension were run to burn over the remaining half of an ESP gas separator left in the wellbore. During the milling operation, the fish began spinning and ceased to make more hole. The bottomhole assembly was pulled from the wellbore with the fish wedged in the burning shoe, ...
  • Dropped Tubing A Permian Basin operator contacted Wellsite Fishing & Rental Services to assist with fishing tubing dropped down hole with the pump still in the tubing. This combination caused the tubing to split and corkscrew towards the bottom of the string. The Wellsite fishing operator utilized an overshot to tag and latch on to the top ...

 

^