Reverse/Fishing Operation

Wellsite was requested to assist an operator with a fishing job consisting of parted tubing. Two of Wellsite’s reverse unit/fishing operators were mobilized, along with one of several high performing JWS340 pumps, a tank and a 2.5 power swivel. In addition to the parted tubing in the well, the ESP pump was also down hole. During the parting of the production tubing, the torque and force of the separation caused the ESP electric wire to bind up and stack on top of the remaining tubing, anchor and ESP pump. The additional production equipment down hole increased the difficulty of the fishing job. The Wellsite fishing team was able to quickly assess the situation and devise a plan to retrieve the fish. The plan was successfully executed, allowing operations to resume.

Contact our experienced team for any reverse unit or fishing needs.